Office Site Analysis

Our certified and experienced Systems Engineers
will provide a complete needs analysis.


bullet Interview with appropriate personnel and access needs for the following:
  • Server
  • Computer
  • Laptop
  • Printer
  • Connectivity
  • Software Tools
  • Licenses required
  • Memory requirements
  • Other appropriate office automation tools
bullet CTR On-Site Analysis Phase Requirement:
  • The Technical Review Engineer shall record the findings of the Site Analysis in the site details spreadsheet.
  • Take inventory and capture all existing hardware, buildings and any other unique system needs. Ensure that proper facilities exist, and that the expected server location has adequate temperature controls.
  • Ensure licesing is sufficient for any software to be installed or migrated.
  • Identify additional hardware or software required to complete an installation (connectors, cables, peripherals, or software).
  • Verify the availability of power, phone, and network jacks, especially in relation to new or existing hardware.
  • Identify any cabling needs.
  • Site Analysis doesnot include troubleshoot existing hardware or software.
bullet Recommendation will be delivered within 4 business days in written needs analysis.
  • CTR will recommend Tier 1 product or Clone compatible if requested.
  • Special needs will be accessed for "best fit" of each user.
  • PC brand and speed will be provided with 2 choices.
  • Software and Licenses needs will be advised.
  • Printer needs will be evaluated and recommended.
  • Network connectivity will be evaluated.
  • Security will be recommended if necessary.


This does not include equipment purchase or installation. It remains a recommendation only. CTR will not recommend Manufacturer specific unless requested. Tier 1 and Tier 2 products will be needed for analysis.

For On-Site Service a travel charge will apply
(call for more details)

top | back

Copyright © 2002-2008, Computer Technology Resources (CTR).  All rights reserved